|
2009
November 2nd: laid out the new camp sites, cleaned brush, tore down old rotted structures. cleared trails.
November 5th: Mowed the grass on the lane, parking lot, and activity field, cleared leaves off the main trail in the camp, moved the two latrines to new locations. cleared brush from the trail from the parking area to the activity field, cleared brush and removed some trees.
November 21st: fill in low spots on the roadway, fill in wash out were the creek runs under the trail to the activity field, start work on fixing the entrance sign, finsh the new latrine holes, and work on clearing the trails to the patrol camp sites.
2010
January 23-24th: First Camping trip of the new year and the reformed Troop.
April 3rd replaced cross pipe on roadway, fixed flag pole, and filled in pot holes in camp road.
April 9-11th: Troop camping trip with Pack 175 Webelos.
|